-- card: 104120 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: In the Timeline Charts 3 -- part 1 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 2 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=85 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=57 right=85 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part contents for background part 31 ----- text ----- Adding Actual Data -- part contents for background part 32 ----- text ----- In the Timeline Charts -- part contents for card part 2 ----- text ----- To change the Actual Start date of a task: -- part contents for background part 6 ----- text ----- Place the pointer in the task’s actual bar. Drag to the correct date on the timeline. The whole bar moves. -- part contents for background part 27 ----- text ----- 1. 2. -- part contents for card part 3 ----- text ----- To change the Actual Finish date of a task: -- part contents for background part 7 ----- text ----- Place the pointer on the right edge of the task’s actual bar. When the pointer is positioned properly, it changes to an outlined crossbar. Drag to the appropriate date on the timeline. The bar stretches out to the new finish date. -- part contents for background part 28 ----- text ----- 1. 2. -- part contents for card part 1 ----- text ----- 3 of 3